ONE

Address: Standard Chartered Tower, Millennium City 1, 388 Kwun Tong Road, Kwun Tong, Kowloon

Address

 

Here at iAdvantage, we understand that the development potential of Kowloon East would mean businesses like yours could be moving in. Aiming to provide you with the utmost convenience, our vision of a data centre with 20,000 square feet GFA at Millennium City in Kwun Tong was realized with ONE.

ONE offers customers flawless and high-speed Internet connections. Designed and built in alignment with our server colocation principles of reliability, security and scalability, deploying a network of multiple-fiber optics and direct ground-level risers.

Companies operating across different industry segments will value our carrier neutral policy, which allows customers flexibility to select the network service provider that best caters to their business needs.

ONE | SUNeVision iAdvantage Hong Kong Data Center

 

Key advantages:

  • Robust infrastructure
  • High resiliency of power supply provided by unique and directly connected power feeders between iAdvantage and the power company
  • Readily available variety of sites connecting to other iAdvantage data centres located in different power grid
  • Sophisticated security system with 24-hour CCTV surveillance and security guards ensure a comprehensive security access control

Resources:

 

What colocation facilities can you expect at ONE ?

ONE | SUNeVision iAdvantage Hong Kong Data Center FACILITY FACILITY 

Data centre area (GFA) About 20,000 sq. ft.
Floor height 3.75 m (2.74 m under beam)
Floor loading 3 kPa
Rack size 42U, 45U, 48U racks

 

ONE | SUNeVision iAdvantage Hong Kong Data Center POWER POWER 

UPS 2N UPS configuration with 15 mins. battery backup
Power connection Dual power feeds / UPS sources to rack
Voltage 220 V / single-phase, 50 Hz
Power provision Standard power zone: average 1.5 kVA per rack
High power zone: 3 kVA per rack
Generator sets 2N design
Backup diesel Multiple fuel tanks with fuel supply contract
Power auto switch Rack mounted type static-transfer-switch

 

ONE | SUNeVision iAdvantage Hong Kong Data Center COOLING COOLING 

CRAC N+1 CRAC design
Up / down flow systems with hot and cold aisles design
Chillers plant N/A
Temperature 22 +/- 2 degree Celsius
Humidity 50 +/- 10%

 

 

ONE | SUNeVision iAdvantage Hong Kong Data Center FIRE AND WATER LEAKAGE DETECTION FIRE AND WATER LEAKAGE DETECTION 

Fire suppression Gas based FM-200 / Smoke detection system / Double interlock pre-action sprinkler
Water leakage detection Distance type water detection system

 

ONE | SUNeVision iAdvantage Hong Kong Data Center SECURITY SECURITY

Surveillance monitoring 24 hours surveillance CCTV with digital recording
Building security 24 hours entrance security guards to control access
Access control Access control system

 

ONE | SUNeVision iAdvantage Hong Kong Data Center CONNECTIVITY CONNECTIVITY 

Networks Dual feed building lead in for telecom cable access
2 x Telecommunications Broadcasting Equipment rooms
Exchange hub for telecom carrier interconnection
Data cable access Cat 5E, Cat 6, SM/MM fiber, DS3, E1, Coaxial

 

 

 

*The above specifications are subject to change. Custom-built specifications can be provided on request.